Scope of work — Level 2 EV charger and 100A garage sub-panel
| Description | Qty | Unit | Rate | Amount |
|---|---|---|---|---|
| 100A sub-panel, 24-space, with breakers | 1 | ea | $620.00 | $620.00 |
| 6/3 copper feeder, per ft | 45 | ft | $9.50 | $427.50 |
| 60A breaker for EV circuit | 1 | ea | $58.00 | $58.00 |
| Install customer-supplied 48A chargerLabor below | 1 | ea | $0.00 | Included |
| Electrical labor | 14 | hr | $145.00 | $2,030.00 |
| Permit and inspection | 1 | ea | $165.00 | $165.00 |
- Subtotal
- $3,300.50
- Tax on materials (7.5%)
- $82.91
- Total
- $3,383.41
Notes
Customer supplies the charger. Price includes trenching-free route through the attic.
Terms
- Pricing is valid until the expiry date shown above.
- A 30% deposit is due at approval for equipment over $5,000; the balance is due on completion.
- Workmanship is warranted for one year. Equipment carries the manufacturer’s warranty, registered by us on your behalf.
- Permit fees are included where listed. Concealed conditions found during work (damaged ductwork, code corrections) are quoted before any extra work begins.
Approved by Rachel Cooper